ITK/Release Schedule
From KitwarePublic
< ITK
Jump to navigationJump to search
Schedule of upcoming ITK releases
Release Number | Date |
---|---|
2.2 | August 30 2005 |
2.4 | November 30 2005 |
2.6 | February 28 2006 |
2.8 | May 30 2006 |
Release Life Cycle
Last period for adding classes and features
- New classes will be selected from good reviews from the Insight Journal
- New features and new methods can be added during this period.
Feature Freeze
- Increase code coverage
- address any UNTESTED files
- address files with code coverage lower than 80%
- Address Run-time memory issues
- Purify reports
- Valgrind reports
CVS Tagging
The repository is tagged by using two tags, one for the reference, and another for the branch.
Posting Tarballs
- Tarballs are posted to SourceForge
- Tarballs are linked from the ITK Download
Release 2.4 Schedule
Release Number | Start Date | End Date |
---|---|---|
Last period for adding classes | October 15 2005 | November 11 2005 |
Feature freeze | November 12 2005 | November 28 2005 |
CVS Tagging | November 29 2005 | November 29 2005 |
Posting tarballs | November 30 2005 | November 30 2005 |
Release 2.6 Schedule
Release Number | Start Date | End Date |
---|---|---|
Last period for adding classes | January 15 2006 | February 11 2006 |
Feature freeze | February 12 2006 | February 26 2006 |
CVS Tagging | February 26 2006 | February 26 2006 |
Testing tarballs | February 26 2006 | February 28 2006 |
Posting tarballs | February 28 2006 | February 28 2006 |
Contributions
Contributions from the Insight Journal being considered for inclusion in this Release. We will follow the procedures outlined here.
Deadline for having 3 reviews : January 31
Except for submission taken from MICCAI Workshop, for which only a code review is needed.
Paper | Reviewer 1 | Done | Reviewer 2 | Done | Reviewer 3 | Done | Shepherd | Recommendation | Committed |
---|---|---|---|---|---|---|---|---|---|
Unsupervised Segmentation of Miofibers (from MICCAI Workshop) | Luis | X | Luis | Include AutomaticThresholdImageFilter (rename class and methods, fix coding style) | Not yet | ||||
Tetrahedral Meshing (from MICCAI Workshop) | Vincent | Sylvain | X | Not include in 2.6, it has Licensing issues | Will not | ||||
Open Topology Toolkit (from MICCAI Workshop) | Bill | Do not include in itk 2.6 | Will not | ||||||
Local Maxima Image Filter | Karthik | X | Andinet | Dan | X | Luis | include in 2.6 | Not Yet | |
B-Spline Scattered Data Approximation | Luis | Lydia | Lydia | Defer for ITK 2.8 | Will not | ||||
Binary Morphological opening and closing | Luis | Jim | Sylvain | X | Jim | Waiting for Author revisions. Defer for ITK 2.8 | Will not | ||
Invert Intensity Image Filter | Luis | X | Bill | X | Sylvain | X | Bill | Include with minor coding style changes | Yes |
Morphological Gradient | Karthik | X | Jim | X | Bill | X | Bill | Include with minor coding changes | Yes |
Modulus Image Filter | Luis | X | Jim | X | Bill | X | Bill | Include with minor coding changes | Yes |
Minimal Imposition Image Filter | Luis | Sylvain | X | Luis | Include with minor coding changes | Not yet | |||
MINC 2.0 IO Support for ITK | Luis | Mathieu | X | Sylvain | X | Defer for ITK 2.8. Concerns about library dependencies. | Will not | ||
Finding regional extrema | Luis | Jim | Luis | Include with minor coding changes (name) | Not tet | ||||
Extending MATLAB with ITK | Karthik | Dan | Karthik | Include in Insight Applications | Yes | ||||
Image Calculator | Luis | Vincent | Bill | Hans | hold on for the reviews | Yes | |||
Probability Distributions for the Insight Journal | Karthik | X | Luis | X | Stephen | X | Jim | Include (finish the reviews) | Not Yet |
Updating GDCM + adding JPEG 2000 | Mathieu | Mathieu to write a report for the IJ | Yes | ||||||
ITK Filter for Bayesian Segmentation | Karthik | Andinet | Luis | Karthik | Include (still finish the reviews) | Yes |
Release 2.8 Schedule
Release Number | Start Date | End Date |
---|---|---|
Reviewing Insight Journal | April 1 2006 | May 1 2006 |
Last period for adding classes | May 1 2006 | May 12 2006 |
Feature freeze | May 12 2006 | May 26 2006 |
CVS Tagging | May 27, 2006 | May 27, 2006 |
Testing tarballs | May 28, 2006 | May 29, 2006 |
Posting tarballs | May 29 2006 | May 30 2006 |
Contributions
Contributions from the Insight Journal being considered for inclusion in this Release. We will follow the procedures outlined here.
Deadline for having 3 reviews : May 1st 2006
Except for submission taken from MICCAI Workshop, for which only a code review is needed.
Paper | Reviewer 1 | Done | Reviewer 2 | Done | Reviewer 3 | Done | Shepherd | Recommendation | Committed |
---|---|---|---|---|---|---|---|---|---|
WrapITK: Enhanced languages support for the Insight Toolkit |