ITK/Tcons/Agendas/2011 08 19
From KitwarePublic
Jump to navigationJump to search
How to Join the Tcon
Number to Call
Please be patient, due to some unforeseen circumstances, the call may not start on time...
- 1-800-728-9607 (in the US) or
- +1 9139049873 (international)
- access code 6815251
Webex
- Meeting link
- https://emeetings.webex.com/emeetings/j.php?ED=138191182&UID=482060457&PW=NNzJiNDk1ZGU3
Project Management
THE END IS NEAR !
- Closing on Beta Release
- Test, Fix, Merge, or Die !
FEM
- Memory leaks pending
- Create Instance bug
- Suggestion to remove the Register call from this method.
- Create Instance bug
Level Sets
- Gerrit patch
Registration
- Transform Patch
- Remaining JIRA Tickets (~10)
- MICCAI Tutorial
Simple ITK
- Image Buffer Access
- Packaging
- MICCAI Tutorial
WrapITK
- ITK-2528 is trivial to close now (wrapitk modules = itk modules)
- ITK-255 has been waiting for reviews for a week
- SUpport for 64bits type ongoing (Unsigned long => SizeValueType/IdentifierType)
- New nightly up and running (Karoshi2, WRAPITK), continuous on the way (Karoshi)
DICOM
- Many small bug fixes and stability improvement
- ITK-262 (fix warnings in gdcmDataSet)
- ITK-279 (m_FrameOfReferenceInstanceUID is generated but not saved in Code/IO/itkGDCMImageIO.cxx)
- ITK-288 (Missing size checking in itkGDCMImageIO::Write when using GDCM 2.0)
- ITK-235 (GDCMTargets.cmake is not installed)
- need to reproduce the zSpacing problem: ITK-182 (brad?)
- Big tickets started and ready for next sprint ( RT, Stream and PACS in order )
- New nightly up and running (Karoshi2, GDCM-PROPER and GDCM-FORK), continuous on the way (Karoshi)
GPU
- Status ?
- Mac Compilation
- Scope of filters to support ?
TIFF Update
- Hackathon August 2011
- Updating to TIFF 4.0 Beta 7
- Support for BigTiff (>4Gb images)
- Working on support for Aperio (.svs images)
- Updating to TIFF 4.0 Beta 7
Bug fix release
- ITK 3.20.1
- Fix Win64 Visual Studio compile issues
- Fix GCC 4.6 issues
- Pending patch on ImageIO issue raised by Slicer.
- Bill Lorensen will look at it and potentially put a Gerrit patch.
- Stable release for Slicer to build against
- ITK First: Hold ground on quality control
Schedule
- Transition Plan
- ITKv4 Alpha-09 Tagged
BETA RELEASE
- New Date : September 15th
- SCRUM Process
- Tools: (demo) https://itk.icts.uiowa.edu/jira/secure/Dashboard.jspa
- Five Sprints (two weeks each).
- Three Sprints Left.
- Five Sprints (two weeks each).
- Tools: (demo) https://itk.icts.uiowa.edu/jira/secure/Dashboard.jspa