ITK/Release Schedule: Difference between revisions
From KitwarePublic
< ITK
Jump to navigationJump to search
Line 78: | Line 78: | ||
Contributions from the Insight Journal being considered for inclusion in this Release | Contributions from the Insight Journal being considered for inclusion in this Release | ||
Deadline for having 3 reviews : January 31 | |||
Except for submission taken from MICCAI Workshop, for which only a code review is needed. | |||
{| border="1" | {| border="1" |
Revision as of 18:40, 6 January 2006
Schedule of upcoming ITK releases
Release Number | Date |
---|---|
2.2 | August 30 2005 |
2.4 | November 30 2005 |
2.6 | February 28 2006 |
2.8 | May 30 2006 |
Release Life Cycle
Last period for adding classes and features
- New classes will be selected from good reviews from the Insight Journal
- New features and new methods can be added during this period.
Feature Freeze
- Increase code coverage
- address any UNTESTED files
- address files with code coverage lower than 80%
- Address Run-time memory issues
- Purify reports
- Valgrind reports
CVS Tagging
The repository is tagged by using two tags, one for the reference, and another for the branch.
Posting Tarballs
- Tarballs are posted to SourceForge
- Tarballs are linked from the ITK Download
Release 2.4 Schedule
Release Number | Start Date | End Date |
---|---|---|
Last period for adding classes | October 15 2005 | November 11 2005 |
Feature freeze | November 12 2005 | November 28 2005 |
CVS Tagging | November 29 2005 | November 29 2005 |
Posting tarballs | November 30 2005 | November 30 2005 |
Release 2.6 Schedule
Release Number | Start Date | End Date |
---|---|---|
Last period for adding classes | January 15 2005 | February 11 2005 |
Feature freeze | February 12 2005 | February 26 2005 |
CVS Tagging | February 26 2005 | February 26 2005 |
Testing tarballs | February 26 2005 | February 28 2005 |
Posting tarballs | February 28 2005 | February 28 2005 |
Contributions
Contributions from the Insight Journal being considered for inclusion in this Release
Deadline for having 3 reviews : January 31
Except for submission taken from MICCAI Workshop, for which only a code review is needed.
Paper | Reviewer 1 | Reviewer 2 | Reviewer 3 |
---|---|---|---|
Unsupervise Segmentation of Miofibers (from MICCAI Workshop) | Reviewer 1 | Reviewer 2 | Reviewer 3 |
Tetrahedral Meshing (from MICCAI Workshop) | Reviewer 1 | Reviewer 2 | Reviewer 3 |
Open Topology Toolkit (from MICCAI Workshop) | Reviewer 1 | Reviewer 2 | Reviewer 3 |
Local Maxima Image Filter | Reviewer 1 | Reviewer 2 | Reviewer 3 |
B-Spline Scattered Data Approximation | Reviewer 1 | Reviewer 2 | Reviewer 3 |
Binary Morphological opening and closening | Reviewer 1 | Reviewer 2 | Reviewer 3 |
Invert Intensity Image Filter | Reviewer 1 | Reviewer 2 | Reviewer 3 |
Morphological Gradient | Reviewer 1 | Reviewer 2 | Reviewer 3 |
Modulus Image Filter | Reviewer 1 | Reviewer 2 | Reviewer 3 |
Minimal Imposition Image Filter | Reviewer 1 | Reviewer 2 | Reviewer 3 |
MINC 2.0 IO Support on ITK | Reviewer 1 | Reviewer 2 | Reviewer 3 |
Finding regional extrema | Reviewer 1 | Reviewer 2 | Reviewer 3 |
Extending MATLAB with ITK | Reviewer 1 | Reviewer 2 | Reviewer 3 |
Image Calculator | Reviewer 1 | Reviewer 2 | Reviewer 3 |