ITK/Release Schedule: Difference between revisions

From KitwarePublic
< ITK
Jump to navigationJump to search
No edit summary
No edit summary
Line 40: Line 40:
* Tarballs are linked from the ITK Download
* Tarballs are linked from the ITK Download


== Release 2.6 ==
== Release 2.6 Schedule ==


{| border="1"
{| border="1"
Line 57: Line 57:




== Release 2.8 ==
== Release 2.8 Schedule ==


{| border="1"
{| border="1"

Revision as of 21:40, 3 December 2005

Schedule of upcoming ITK releases

Release Number Date
2.2 August 30 2005
2.4 November 30 2005
2.6 February 28 2006
2.8 May 30 2006


Release Life Cycle

Last period for adding classes and features

  • New classes will be selected from good reviews from the Insight Journal
  • New features and new methods can be added during this period.

Feature Freeze

  • Increase code coverage
    • address any UNTESTED files
    • address files with code coverage lower than 80%
  • Address Run-time memory issues
    • Purify reports
    • Valgrind reports

CVS Tagging

The repository is tagged by using two tags, one for the reference, and another for the branch.

Posting Tarballs

  • Tarballs are posted to SourceForge
  • Tarballs are linked from the ITK Download

Release 2.6 Schedule

Release Number Start Date End Date
Last period for adding classes October 15 2005 November 11 2005
Feature freeze November 12 2005 November 28 2005
CVS Tagging November 29 2005 November 29 2005
Posting tarballs November 30 2005 November 30 2005


Release 2.8 Schedule

Release Number Start Date End Date
Last period for adding classes January 15 2005 February 11 2005
Feature freeze February 12 2005 February 26 2005
CVS Tagging February 26 2005 February 26 2005
Testing tarballs February 26 2005 February 28 2005
Posting tarballs February 28 2005 February 28 2005