ITK/Tcons/Minutes/2012 02 03: Difference between revisions
From KitwarePublic
Jump to navigationJump to search
No edit summary |
(→Cycles) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 10: | Line 10: | ||
= Project Topics = | = Project Topics = | ||
* Discussed Freezing process before releases | |||
** Period of release candidates | |||
== Cycles == | |||
# Development Cycle | |||
# Release candidates run-up (1 per week) | |||
## Introduce fixes (5 days of the RC cycle) | |||
## Freezing 2 days before tagging each release candidate. | |||
= Technical Topics = | = Technical Topics = |
Latest revision as of 15:35, 3 February 2012
Attendees
- Jim Miller
- Bill Lorensen
- Brad Lowekamp
- Brian Avants
- Luis Ibanez
- Matt McCormik
Project Topics
- Discussed Freezing process before releases
- Period of release candidates
Cycles
- Development Cycle
- Release candidates run-up (1 per week)
- Introduce fixes (5 days of the RC cycle)
- Freezing 2 days before tagging each release candidate.