ITK/Tcons/Minutes/2012 02 03: Difference between revisions

From KitwarePublic
< ITK‎ | Tcons‎ | Minutes
Jump to navigationJump to search
 
Line 15: Line 15:
== Cycles ==
== Cycles ==


1) Development Cycle
# Development Cycle
2) Release candidates run-up (1 per week)
# Release candidates run-up (1 per week)
2.1) Introduce fixes (5 days of the RC cycle)
## Introduce fixes (5 days of the RC cycle)
2.2) Freezing 2 days before tagging each release candidate.
## Freezing 2 days before tagging each release candidate.


= Technical Topics =
= Technical Topics =

Latest revision as of 15:35, 3 February 2012

Attendees

  • Jim Miller
  • Bill Lorensen
  • Brad Lowekamp
  • Brian Avants
  • Luis Ibanez
  • Matt McCormik

Project Topics

  • Discussed Freezing process before releases
    • Period of release candidates

Cycles

  1. Development Cycle
  2. Release candidates run-up (1 per week)
    1. Introduce fixes (5 days of the RC cycle)
    2. Freezing 2 days before tagging each release candidate.

Technical Topics

Dashboard

Gerrit

Status

Action Items