[Paraview] loading time variant data via a script file
    John Vines <jvines> 
    jvines at arl.army.mil
       
    Fri Sep  1 08:54:39 EDT 2006
    
    
  
All,
	I am trying to load time variant, multi-block Plot3D data via a .pvs
script and am not having much luck.  I have 12 grids and 40 timesteps
for each grid.  The script will load only the first timestep.  Will
a .pvs file load more than one timestep?  Am I doing something wrong?  
I am using Paraview 2.5.
Thanks in advance,
John
    
    
More information about the ParaView
mailing list