MantisBT - ITK
View Issue Details
0009888ITKpublic2009-11-12 14:072010-11-07 01:15
Kevin H. Hobbs 
Luis Ibanez 
highfeatureN/A
assignedopen 
 
 
backlog
0009888: Run Large Memory Tests Sequentially
Presently when ITK is tested in parallel with the ctest -jN option and the large memory tests are enabled with large values of ITK_COMPUTER_MEMORY_SIZE several of the IO tests are run in parallel. This can use all of the RAM on the testing computer, cause disk swapping, slow the testing, and potentially cause the tests to fail.

These tests should be run sequentially with the RUN_SERIAL property.
To fix using the nightly build in eldorado.kitware.
No tags attached.
Issue History
2009-11-12 14:07Kevin H. HobbsNew Issue
2009-11-13 12:09Luis IbanezStatusnew => assigned
2009-11-13 12:09Luis IbanezAssigned To => Luis Ibanez
2010-11-07 01:15Luis IbanezSprint Status => backlog
2010-11-07 01:15Luis IbanezPrioritynormal => high
2010-11-07 01:15Luis IbanezAdditional Information Updated

There are no notes attached to this issue.