<div dir="ltr">dash3 is back up now and karego-at should be joining it in the continuous section shortly.<div><br></div><div style>dash3's problem was that it hadn't updated the dashboard scripts and so was stuck at the commit before the gl2ps paths were fixed and camblur was disabled.</div>

<div style><br></div></div><div class="gmail_extra"><br clear="all"><div>David E DeMarle<br>Kitware, Inc.<br>R&D Engineer<br>21 Corporate Drive<br>Clifton Park, NY 12065-8662<br>Phone: 518-881-4909</div>
<br><br><div class="gmail_quote">On Tue, Mar 5, 2013 at 8:35 AM, David E DeMarle <span dir="ltr"><<a href="mailto:dave.demarle@kitware.com" target="_blank">dave.demarle@kitware.com</a>></span> wrote:<br><blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex">

<div dir="ltr">I'm turning off the continuous build on dash3 today so that I can track down the issues it has on the nightly. It should be back this afternoon.<span class="HOEnZb"><font color="#888888"><div><br></div>

<div><div>David E DeMarle<br>Kitware, Inc.<br>
R&D Engineer<br>21 Corporate Drive<br>Clifton Park, NY 12065-8662<br>Phone: <a href="tel:518-881-4909" value="+15188814909" target="_blank">518-881-4909</a></div>
</div></font></span></div>
</blockquote></div><br></div>