<div dir="ltr">On Thu, Oct 17, 2013 at 5:31 PM, Nils Gladitz <span dir="ltr"><<a href="mailto:nilsgladitz@gmail.com" target="_blank">nilsgladitz@gmail.com</a>></span> wrote:<br><div class="gmail_extra"><div class="gmail_quote">
<blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex">Hello Bill, thanks for looking into this!<br>
<br>
All four tests in my example are still run (as you can see in the test output I provided).<br>
This includes the dependent test.<br>
<br>
What I did change is that all tests (from an dependency or otherwise) are run from StartNextTests() which ensures that serial tests run alone rather than from StartTest() which did not seem to account for this.<br></blockquote>
<div>I am not saying it won't run all of the tests.  I am saying there is a danger it will ignore the depends with your change and run a depend before the test that depends on it.  I don't see it using the depends in the sort.  Maybe a better fix would be to make sure the sort takes the depends into consideration.  </div>
<div><br></div><div>Or, just change the depend starting in StartTest to make sure it does not start a serial test with another test running.</div><div><br></div><div>-Bill </div></div></div></div>