<div dir="ltr"><div class="gmail_extra"><div class="gmail_quote">On Fri, May 15, 2015 at 3:40 PM, Foucar, James G <span dir="ltr"><<a href="mailto:jgfouca@sandia.gov" target="_blank" onclick="window.open('https://mail.google.com/mail/?view=cm&tf=1&to=jgfouca@sandia.gov&cc=&bcc=&su=&body=','_blank');return false;">jgfouca@sandia.gov</a>></span> wrote:<br><blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex">



<div style="word-wrap:break-word;color:rgb(0,0,0);font-size:14px;font-family:Calibri,sans-serif">
<div>Hello,</div>
<div><br>
</div>
<div>My current project has a number of “Nightly” tests that run for several days. The issue I’m having is that these builds are posted to CDash and only remain on the Nightly dashboard for about 24 hours. I really love for the dashboard to display a build
 until a newer build with the same name is submitted. Is this possible?</div></div></blockquote><div><br></div><div><br></div><div>Not that I know of.  As you noticed, CDash currently only supports reporting build results on a day to day basis.  It would be nice if this behavior could be configured differently per build group: daily, weekly, last N builds, etc.  As things are now, the only workaround I can think of would be to resubmit the same .xml files day after day.</div></div></div></div>