View Issue Details Jump to Notes ] Print ]
IDProjectCategoryView StatusDate SubmittedLast Update
0009888ITKpublic2009-11-12 14:072010-11-07 01:15
ReporterKevin H. Hobbs 
Assigned ToLuis Ibanez 
PriorityhighSeverityfeatureReproducibilityN/A
StatusassignedResolutionopen 
PlatformOSOS Version
Product Version 
Target VersionFixed in Version 
Summary0009888: Run Large Memory Tests Sequentially
DescriptionPresently when ITK is tested in parallel with the ctest -jN option and the large memory tests are enabled with large values of ITK_COMPUTER_MEMORY_SIZE several of the IO tests are run in parallel. This can use all of the RAM on the testing computer, cause disk swapping, slow the testing, and potentially cause the tests to fail.

These tests should be run sequentially with the RUN_SERIAL property.
Additional InformationTo fix using the nightly build in eldorado.kitware.
TagsNo tags attached.
Resolution Date
Sprint
Sprint Statusbacklog
Attached Files

 Relationships

  Notes
There are no notes attached to this issue.

 Issue History
Date Modified Username Field Change
2009-11-12 14:07 Kevin H. Hobbs New Issue
2009-11-13 12:09 Luis Ibanez Status new => assigned
2009-11-13 12:09 Luis Ibanez Assigned To => Luis Ibanez
2010-11-07 01:15 Luis Ibanez Sprint Status => backlog
2010-11-07 01:15 Luis Ibanez Priority normal => high
2010-11-07 01:15 Luis Ibanez Additional Information Updated


Copyright © 2000 - 2018 MantisBT Team